Currently progressing through the Building Safety Regulator (BSR) application process, the façade remediation of Montmano and Boulevard properties focuses on removing combustible materials from two blocks of flats at Montmano Drive & The Boulevard, Manchester..
The external works comprise of the removal and replacement of the existing combustible façade finishes. This includes the removal of the existing HPL composite rainscreen panels and existing timber cladding and associated timber support systems. Existing timber cladding and associated timber support systems will also be removed and replaced with Walnut horizontal Evverlap ship-lapped panels, installed on a new proprietary bracket and support system.
New horizontal and vertical fire compartment cavity barriers will be installed within the refurbished cladding zones. The type, extent, and location of fire barriers will be in accordance with the approved design details
Internal works comprises of above-ceiling fire-stopping to service penetrations, undertaken within communal areas and individual apartments. Works will be carried out in a controlled and phased manner to maintain fire compartmentation and minimise disruption to building occupants. Internal works will be phased by floor, with temporary fire-stopping measures installed where required to ensure no penetrations are left unprotected at the end of a working period.
Status: April 2027
PROJECT
Didsbury Point
LOCATION
Manchester
CLIENT
Vistry Homes Ltd
CONTRACT
Countryside Properties UK Ltd
VALUE
£3.8 million